中國對外承包工程商會頒布2019版系列分包工程合同
12.3.6 In the event of discrepancies between the results of the Contractor's quality inspections and those of the Employer and/or the Engineer, the results of the Employer's and/or the Engineer's inspections shall be final and prevail.